HVAC Replacement at Mount Isa Village

Value

$1,700,000

Category

Case Studies

Description

The Problem

Enginuity D&C faced a daunting task when subcontracted by Knight Frank to replace the entire HVAC system at Mount Isa Shopping Village. The catch was that anchor tenants, Coles and Kmart, had as conditions of their leases a clause that energy interruptions could not extend beyond 24 hours. With a vast area of 15,000 square meters and scorching summer temperatures in Mount Isa, meticulous planning and precise execution were imperative to meeting the tight timeframe.

Our Solution

Enginuity D&C methodically planned and pre-fabricated the entire cooling system upgrade. When the countdown clock started, our team of 10 professionals worked tirelessly to complete the chiller plant and BMCS upgrades within 24 hours. Our commitment to excellence, adaptability and seamless coordination ensured the anchor tenants’ cooling requirements were met without any downtime. This achievement solidified our reputation Knight Frank and SCA as a reliable partner that delivers on schedule even in the harshest of environments.

The Numbers

  • 15000 Square Metres of Cooling Space
  • 10 Installers
  • 24-hour deadline